Quick Answer
Take Chongqing Rail Transit Line 2 to Liziba Station and follow signs to the official viewing plaza if you want the classic photo. If you want to ride through the building, board Line 2 at a neighboring stop and travel through Liziba. Use the signed pedestrian route to the plaza.[1][3][4]
| What you want | Best approach |
|---|---|
| Photograph the train and building together | Watch from the designated plaza at street level. |
| Experience the ride through the building | Travel through Liziba on a Line 2 train. |
| Do both | Ride to Liziba, watch from the plaza, then plan how you will continue. |
| Visit with fewer stairs | Check which station exit and route are accessible on your day. |

There are two ways to experience Liziba. From the viewing plaza, you can see the train enter or leave a building with apartments above the station. From a Line 2 train, you can ride through that station. Pick the experience you care about most before you decide where to start.
How the Train and Building Fit Together
Liziba Station is an elevated straddle monorail station built as part of a mixed residential and commercial building in the Yuzhong District. The train rides on a concrete beam that leads directly into the station. You see the train and the apartments above it in the same view when you watch from the lower street. This is a working rail stop as well as a sightseeing spot.[1]
Where to Watch the Monorail
Go to the designated Liziba viewing plaza on the lower street. Stand back enough to get the rail beam and part of the building into the frame. Allow time to find a clear place in the plaza and to wait for a train. Give other people room to pass rather than switching to the road edge. Daylight helps if you want to see both the front of the train and the shape of the building. If you are also visiting Hongya Cave, save the after-dark part of the day for that stop.[1]
Starting October 13, 2026, a local traffic notice directed visitors to cross at the Jialing New Road junction. The crossing immediately by the platform was removed. Follow the current signs on arrival and use the posted crossing rather than following an older video or map arrow across the road.[3]
How to Ride Through Liziba
On Line 2, Liziba is between Niujiaotuo and Fotuguan. If you only want to experience the ride, board at either neighboring stop in the direction of Liziba and decide whether to get off there or continue. To see more of the surrounding approach, use a window without blocking other passengers. See the Chongqing metro guide for interchanges.[1][4]
If you plan to watch after the ride, leave the station for the public plaza. Then decide whether you want the signed route back into the station, a taxi from the proper pickup point, or the next location on foot. A ride through the building and a view from the street take place on different levels.
Allow Time for the Station and Return
Treat Liziba as one sightseeing stop. Allow about 30 to 45 minutes between stepping off the train and continuing onward as a planning estimate, plus your travel to and from the area. Keep extra time when station routes are crowded or under construction. A municipal notice scheduled partial platform works through November 30, 2026. Follow active signs and check current access, especially if your group needs an elevator or a particular station exit.[2]
From Liziba you can use a simple onward trip to central Yuzhong, or choose a longer visit nearby if the day is open. The one-day Chongqing itinerary combines it with the center and Hongya Cave. Use the Chongqing hills and navigation guide when a map shows a short walk but an unclear change of height.
FAQs About the Liziba Monorail
Do I need an admission ticket for the viewing plaza?
The official viewing plaza is a public viewing space at street level. Pay the regular rail fare if you use Line 2. Check local signs if access changes around construction or crowd controls.[1][2]
Can you see the train from inside the building?
You can watch it from the station’s permitted passenger areas or ride it through. For the angle that shows the train and the outside of the building together, use the designated plaza.[1]
What if the viewpoint is crowded?
Allow for a longer wait, or do the ride and continue your day. Stay within the permitted viewing and walking areas and use the signed crossing.[1][3]
Sources
[1] Chongqing Municipal Government. Liziba station and official viewing plaza
[2] Chongqing Municipal Government. Liziba station construction notice
[3] Chongqing Evening News. October pedestrian crossing changes at the Liziba viewpoint
[4] MetroMan. Chongqing Rail Transit Line 2 stations and interchanges





